ASC/FSGP 2014 Team Status

Pre-Event Status

The following status designations are for the vehicle design and administrative documents only. All finished solar cars will be required to undergo a full inspection during Scrutineering prior to racing.

Color Status Description
Requirement Completed: No further action required
Review In Process: Submitted Information is Being Reviewed by Officials
Action Required: Submitted Information is Insufficient – Correct and Resubmit
Immediate Action Required: Information Overdue – Submit ASAP

Administrative Documents

This status board covers the various documents required prior to racing.  The Vehicle Design Report (Reg. 3.4) has its own status board below with sub categories.

# Item Reg Due Date Submit To
1 Team Entry Form 3.1.A Aug 15, 2013 ascteams@americansolarchallenge.org
2 Initial Fee ($1,000 USD) 3.1.A Aug 15, 2013 IEF, PO Box 2368 Rolla, MO 65402
3 Proof of Insurance 3.11 Aug 15, 2013 ascteams@americansolarchallenge.org
4 Team Participation Agreement 3.1.A Aug 15, 2013 ascteams@americansolarchallenge.org
5 Preliminary Vehicle Report 3.3 Aug 15, 2013 ascteams@americansolarchallenge.org
6 Track Fee ($3,000 USD) 3.1.B Oct 15, 2013 IEF, PO Box 2368 Rolla, MO 65402
7 Vehicle Design Report 3.4 Oct 15, 2013 ascteams@americansolarchallenge.org
8 Road Fee ($3,000 USD) 3.1.C Mar 15, 2014 IEF, PO Box 2368 Rolla, MO 65402
9 Team Photo 3.6.A May 01, 2014 ascteams@americansolarchallenge.org
10 Team Data Sheet 3.6.B May 01, 2014 ascteams@americansolarchallenge.org
11 Individual Participation Agreement 3.7 TBD N/A – each person will sign once on-site
12 Emergency Information Form 3.7 TBD Bring to on-site registration
Team # – Name 1 2 3 4 5 6 7 8 9 10
3 – Kentucky
13 – Michigan State
24 – Waterloo
31 – Oklahoma
55 – Polytecyhnique Montreal
116 – McMaster
254 – CalSol
786 – Western Michigan
? – Puerto Rico Mayaguez

Vehicle Design Report Board

Status board shows each sub section of the Vehicle Design Report called for in regulations 3.4.B – 3.4.E.

# Item Reg Due Date Submit To
1 Mechanical Tech Report 3.4.B Oct 15, 2013 ascteams@americansolarchallenge.org
2 Electrical System Tech Report 3.4.C Oct 15, 2013 ascteams@americansolarchallenge.org
3 Battery Tech Report 3.4.D Oct 15, 2013 ascteams@americansolarchallenge.org
4 Battery Protection Tech Report 3.4.E Oct 15, 2013 ascteams@americansolarchallenge.org
5 Solar Array Tech Report 3.4.F Oct 15, 2013 ascteams@americansolarchallenge.org
Team # – Name 1 2 3 4 5

Last Update: 6-18-2013